winding adj. 1.卷繞的;繞線的,繞組的。 2.迂回曲折的,蜿蜒的。 a winding path 彎彎曲曲的小路。 a winding staircase 螺旋樓梯。 n. 1.卷繞起來的一盤(繩索等);卷繞動作;絡(luò)紗。 2.彎曲,紆曲;不正行為。 3.【采】卷揚(yáng),提升;【電學(xué)】繞組,繞法;線圈。 banked winding 【電學(xué)】簡單繞組;重疊繞法。 series winding 【電學(xué)】串激繞組。 in winding (木板)翹曲。 out of winding 不翹,不彎曲。
Application of transducer in controlling winding tension 變頻器在粗紗卷繞張力控制中的應(yīng)用
Uses the sourceless magnetic damping tensor to control winding tension 繞線張力控制采用無源磁阻尼張力器控制。
They have mysterious abilities to control wind / rain / snow / fog and all other weather phenomenon 通常會在簡單、問題不大的情況下,變得狂暴蠻橫。
They have mysterious abilities to control wind / rain / snow / fog and all other weather phenomenon 他們擁有控制風(fēng)、雨、雪、霧和其它所有天氣現(xiàn)象的神秘能力。
It adopts photoelectrical cell control winding and unwinding , has a high precision in printing . if lost sign , machine will stop automatically 使用光電控制放料和收卷,色標(biāo)光電跟蹤使彩印圖案準(zhǔn)確,丟標(biāo)自動停機(jī)。
Some effective measures such as strengthening management , adopting concentrated heating , controlling wind blown , should be taken so as to improve the air environmental quality in changzhi 加強(qiáng)城市集中供熱設(shè)施建設(shè)、控制揚(yáng)塵污染是當(dāng)前改善環(huán)境空氣質(zhì)量行之有效的控制措施。
Aiming at the actual condition of the fiber winding process , as the actual needing of the system , the machining technical parameter monitor system for the numerical control winding machine was designed 針對纖維纏繞加工的實(shí)際狀況,在分析系統(tǒng)需求的基礎(chǔ)上,設(shè)計(jì)了數(shù)控纏繞機(jī)加工工藝參數(shù)監(jiān)測系統(tǒng)。
Conclusion : smoothly tiding over shock stage , controlling glucose intake , timely applying hypoglycemic drug and controlling wound infection are key measures for prevention and treatment of complication by hyperglycemia 結(jié)論:平穩(wěn)渡過休克期,控制糖輸入量,及時應(yīng)用降糖藥物,預(yù)防創(chuàng)面感染,利于防治高血糖癥。
Last but not least , based on the aerodynamics of wind power machines , using the torque observer and speed estimator , a linearized direct speed control wind power generation model has been presentated 最后,針對風(fēng)速的多變性,根據(jù)風(fēng)力機(jī)的動力特性,利用狀態(tài)估計(jì)方法,提出了一種變速風(fēng)力發(fā)電機(jī)直接速度控制模型。
In order to control wind erosion , 5 measures are brought out that to increase artificial rainfall , to develop irrigated farming and to rise using rate of water resource , to control soil erosion , to optimize the frame of crops and solid expoiting , and to establish control and forecast system 提出了防治沙化的5大措施,即增加人工降雨改造利用沙地、發(fā)展灌溉農(nóng)業(yè)提高水資源利用率、治理水土流失、優(yōu)化種植結(jié)構(gòu)、立體開發(fā)、建立健全監(jiān)測預(yù)報(bào)系統(tǒng)。